On the D1PPS front, we’ve sorted out the clutch issue (took a few tries to get all the fittings and seals doing their job properly). All the plumbing is now done and all fluids are filled. We are finishing up wiring, paddle shift systems and will be doing the wings next. The repeated disassembly/assembly gave us some practice in doing this and also gave opportunities to double-check everything.